กก 3. CONSTRUCTION PLANNING AND
SCHEDULING 3.1 Construction Work Quantity The main work quantity to be done in the construction of principal structures and diversion works is as follows: --Earth-and--rock excavation 102.59 million m3
--Earth-and--rock
embankment
29. 33 million m3 --Concrete placing 27.15 million m3 --Re--bar 354. 30กม103 tons --Metal works 280. 8กม103 tons -- Installation of turbine generator 26 sets (18, 200 MW) Work quantities broken down into details according to structures are listed in the following table. |